Breach Solar

Date

2023

Technology

Solar + BESS

Installed Capacity MW

49.9MW + 100MWh

CAPEX GBP

80m

AGR targeted, funded, and developed a 70MW solar park with a 100MW DC connected battery installation, in East Cambridgeshire, UK. The project was developed and funded entirely by AGR and sold to Octopus Energy in 2021 at RTB status. AGR did not sign an EPC contract for the delivery of the asset. Breach solar farm is currently in construction with anticipated date of delivery in 2023.